Creating a sustainable future
Call us: 01303 248648

Client - Jenner Group

Client:
Jenner Group
Project:
Central Parade - Herne Bay
Description:

An impressive project, a construction of a 5-storey building, accommodating 13 luxury apartments at a superb seafront location, providing stunning views out over the Channel. The apartments showcase stylish, modern sanitary ware and chic fitted kitchens, all with an open plan layout perfect for couples, families or retired people. The community landscaped gardens offer a perfect place to relax by the sea with off-road parking at the rear.

System Design:

UFH throughout with Vaillant combination boilers, Boosted Cold water supply via a KGN Piligner 1230 litre tank, with variable speed twin multistage pumps. Gas install via track pipe internal riser. External gas meter manifold and external water.

Scope of Works:

Design & Build project with all UFH, Services and mechanical installtion designed by the Reina Group